Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
ASHRAE Standard 90.1 User\'s Manual, 2016
- Standard 90.1 User's Manual [Go to Page]
- Contents
- 01 Purpose
- 02 Scope
- 03 Definitions, Abbreviations, and Acronyms
- 4 Administration and Enforcement [Go to Page]
- Scope and Compliance (4.1.1 and 4.2) [Go to Page]
- Administrative Requirements (4.1.2)
- Alternative Materials, Methods of Construction, or Design (4.1.3)
- Validity (4.1.4)
- Other Laws (4.1.5)
- Referenced Standards (4.1.6)
- Normative Appendices (4.1.7)
- Informative Appendices (4.1.8)
- Compliance Documentation (4.2.2)
- Labeling of Materials and Equipment (4.2.3)
- Inspections (4.2.4)
- Verification and Commissioning Reporting (4.2.5)
- 5 Building Envelope [Go to Page]
- General (5.1) [Go to Page]
- Scope (5.1.1)
- Space Conditioning Categories (5.1.2)
- Envelope Alterations (5.1.3)
- Climate (5.1.4)
- Compliance Paths (5.2)
- Mandatory Provisions (5.4) [Go to Page]
- Insulation (5.4.1)
- Fenestration and Doors (5.4.2)
- Air Leakage (5.4.3)
- Prescriptive Building Envelope Option (5.5) [Go to Page]
- Using the Criteria Tables (5.5.1 and 5.5.2)
- Opaque Areas (5.5.3)
- Fenestration (5.5.4)
- Building Envelope Trade-Off Option (5.6)
- Product Information and Installation Requirements (5.8) [Go to Page]
- Insulation (5.8.1)
- Fenestration and Doors (5.8.2)
- Inspection and Verification (5.9)
- 6 HVAC Systems [Go to Page]
- General (6.1) [Go to Page]
- Scope (6.1.1)
- Compliance Paths (6.2)
- Simplified Approach Option (6.3)
- Prescriptive Path (Section 6.5)
- Alternative Compliance Path (6.6)
- Energy Cost Budget Method (Section 11)
- Performance Rating Method (Appendix G)
- Simplified Approach Option for HVAC Systems (6.3) [Go to Page]
- Scope (6.3.1)
- Criteria (6.3.2)
- Mandatory Provisions (6.4) [Go to Page]
- Equipment Efficiencies, Verification, and Labeling Requirements (6.4.1)
- Calculations (6.4.2)
- Controls and Diagnostics (6.4.3)
- HVAC&R System Construction and Insulation (6.4.4)
- Walk-In Coolers and Walk-In Freezers (6.4.5)
- Refrigerated Display Case (6.4.6)
- Prescriptive Path (6.5) [Go to Page]
- Economizers (6.5.1)
- Simultaneous Heating and Cooling Limitation (6.5.2)
- Air System Design and Control (6.5.3)
- Hydronic System Design and Control (6.5.4)
- Heat-Rejection Equipment (6.5.5)
- Energy Recovery (6.5.6)
- Exhaust Systems (6.5.7)
- Radiant Heating Systems (6.5.8)
- Hot-Gas Bypass Limitation (6.5.9)
- Door Switches (6.5.10)
- Refrigeration Systems (6.5.11)
- Alternative Compliance Path (6.6) [Go to Page]
- Computer Room Systems (6.6.1)
- Submittals (6.7) [Go to Page]
- Completion Requirements (6.7.2) [Go to Page]
- Drawings (6.7.2.1)
- Manuals (6.7.2.2)
- System Balancing (6.7.2.3) [Go to Page]
- General (6.7.2.3.1)
- Air System Balancing (6.7.2.3.2)
- Hydronic System Balancing (6.7.2.3.3)
- System Commissioning (6.7.2.4)
- ( Minimum Equipment Efficiency Tables (6.8) [Go to Page]
- Table 6.8.1-1—Electrically Operated Unitary Air Conditioners and Condensing Units— Minimum Efficiency Requirements
- Table 6.8.1-2—Electrically Operated Unitary and Applied Heat Pumps— Minimum Efficiency Requirements
- Table 6.8.1-3— Water-Chilling Packages—Minimum Efficiency Requirements
- Table 6.8.1-4—Electrically Operated Packaged Terminal Air Conditioners, Packaged Terminal Heat Pumps, Single-Package Vertical Air Conditioners, Single-Package Vertical Heat Pumps, Room Air Conditioners, and Room Air-Conditioner Heat Pumps— Minimum Eff...
- Table 6.8.1-5—Warm-Air Furnaces and Combination Warm-Air Furnaces/Air-Conditioning Units, Warm-Air Duct Furnaces, and Unit Heaters—Minimum Efficiency Requirements
- Table 6.8.1-6—Gas- and Oil-Fired Boilers—Minimum Efficiency Requirements
- Table 6.8.1-7—Performance Requirements for Heat-Rejection Equipment—Minimum Efficiency Requirements
- Table 6.8.1-8—Heat Transfer Equipment—Minimum Efficiency Requirements
- Table 6.8.1-9—Electrically Operated Variable-Refrigerant-Flow Air Conditioners—Minimum Efficiency Requirements
- Table 6.8.1-10—Electrically Operated Variable-Refrigerant-Flow Air-to-Air and Applied Heat Pumps—Minimum Efficiency Requirements
- Table 6.8.1-11—Air Conditioners and Condensing Units Serving Computer Rooms—Minimum Efficiency Requirements
- Table 6.8.1-12—Commercial Refrigerators and Freezers—Minimum Efficiency Requirements
- Table 6.8.1-13—Commercial Refrigeration—Minimum Efficiency Requirements
- Table 6.8.1-14—Vapor Compression Based Indoor Pool Dehumidifiers—Minimum Efficiency Requirements
- 7 Service Water Heating [Go to Page]
- General (7.1) [Go to Page]
- Scope (7.1.1)
- Compliance Paths (7.2)
- Mandatory Provisions (7.4) [Go to Page]
- Load Calculations (7.4.1)
- Equipment Efficiency (7.4.2)
- ( Service Hot-Water Piping Insulation (7.4.3)
- Service Water Heating System Controls (7.4.4)
- Swimming Pools (7.4.5)
- Heat Traps (7.4.6)
- Prescriptive Path (7.5) [Go to Page]
- Space Heating and Service Water Heating (7.5.1)
- Service Water Heating Equipment (7.5.2)
- Buildings with High-Capacity Service Water Heating Systems (7.5.3)
- 8 Power [Go to Page]
- General (8.1) [Go to Page]
- Scope (8.1.1)
- Mandatory Provisions (8.4) [Go to Page]
- Voltage Drop (8.4.1)
- Automatic Receptacle Control (8.4.2)
- Electrical Energy Monitoring (8.4.3)
- Low-Voltage Dry-Type Distribution Transformers (8.4.4)
- Submittals (8.7) [Go to Page]
- Drawings (8.7.1)
- Manuals (8.7.2)
- 9 Lighting [Go to Page]
- General (9.1) [Go to Page]
- Scope (9.1.1)
- Lighting Alterations (9.1.2)
- Installed Lighting Power (9.1.3)
- Interior and Exterior Luminaire Wattage (9.1.4)
- Compliance (9.2) [Go to Page]
- Prescriptive Requirements (9.2.2)
- Mandatory Provisions (9.4) [Go to Page]
- Lighting Control (9.4.1)
- Functional Testing (9.4.3)
- Building Area Method Compliance Path (9.5)
- Alternative Compliance Path: Space-by-Space Method (9.6) [Go to Page]
- Additional Interior Lighting Power (9.6.2)
- Additional Interior Lighting Power Using Nonmandatory Controls (9.6.3)
- Room Geometry Adjustment (9.6.4)
- Submittals (9.7) [Go to Page]
- General (9.7.1)
- Completion Requirements (9.7.2)
- 10 Other Equipment [Go to Page]
- General (10.1) [Go to Page]
- Scope (10.1.1)
- Mandatory Provisions (10.4) [Go to Page]
- Electric Motors (10.4.1)
- Service Water Pressure-Booster Systems (10.4.2)
- Elevators (10.4.3)
- Escalators and Moving Walks (10.4.4)
- 11 Energy Cost Budget Method [Go to Page]
- General (11.1) [Go to Page]
- Scope and Limitations (11.1.1, 11.1.2, and 11.1.3)
- Compliance (11.2)
- Simulation General Requirements (11.4) [Go to Page]
- Simulation Program (11.4.1)
- Climatic Data (11.4.2)
- Renewable, Recovered, and Purchased Energy (11.4.3)
- Compliance Calculations (11.4.4)
- Exceptional Calculation Methods (11.4.5)
- Calculation of Design Energy Cost and Energy Cost Budget (11.5)
- Documentation Requirements (11.7)
- G Performance Rating Method [Go to Page]
- General (G1) [Go to Page]
- Performance Rating Method Scope (G1.1)
- Performance Rating (G1.2)
- Documentation Requirements (G1.3)
- Simulation General Requirements (G2) [Go to Page]
- Performance Calculations (G2.1)
- Simulation Program (G2.2)
- Minimum Modeling Capabilities (G2.2.1)
- Proposed Building and Baseline Building Performance (G2.2.2)
- Design Load Calculations (G2.2.3)
- Testing (G2.2.4)
- Climatic Data (G2.3)
- Renewable, Recovered, and Purchased Energy (G2.4)
- Exceptional Calculation Methods (G2.5)
- Calculation of the Proposed Design and Baseline Building Performance (G3) [Go to Page]
- Building Performance Calculations (G3.1)
- General Baseline HVAC System Requirements (G3.1.2)
- System-Specific Baseline HVAC System Requirements (G3.1.3)
- ONLINE COMPLIANCE FORMS AND TOOLS [Go to Page]