Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS EN 12259-15:2025 Fixed firefighting systems. Components for sprinkler and water spray systems - Spray pattern sprinklers with a k-factor of at least K160, extended coverage sprinklers of at least K80 and control mode special application sprinklers, 2025
- undefined
- European foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Assessment methods and criteria [Go to Page]
- 4.1 Tolerances
- 4.2 Connections [Go to Page]
- 4.2.1 Assessment method
- 4.2.2 Criteria
- 4.3 Durability of coated sprinklers [Go to Page]
- 4.3.1 Assessment method
- 4.3.2 Criteria
- 4.4 High temperature exposure [Go to Page]
- 4.4.1 Assessment method
- 4.4.2 Criteria
- 4.5 Conductivity (C-Factor) [Go to Page]
- 4.5.1 Assessment method
- 4.5.2 Criteria
- 4.6 Sensitivity (Air oven) [Go to Page]
- 4.6.1 Assessment method
- 4.6.2 Criteria
- 4.7 Leak resistance [Go to Page]
- 4.7.1 Assessment method
- 4.7.2 Criteria
- 4.8 Release of the sprinkler at minimum operating pressure (for spray pattern, EC and ECS sprinklers) [Go to Page]
- 4.8.1 Assessment method
- 4.8.2 Criteria
- 4.9 Nominal operating temperature [Go to Page]
- 4.9.1 Assessment method [Go to Page]
- 4.9.1.1 Apparatus
- 4.9.1.2 Procedure (liquid bath testing)
- 4.9.1.3 Air bath test
- 4.9.2 Criteria [Go to Page]
- 4.9.2.1 Liquid bath criteria
- 4.9.2.2 Air bath criteria
- 4.10 Function (only for CMSA) [Go to Page]
- 4.10.1 Assessment method
- 4.10.2 Criteria
- 4.11 Size of water passageways [Go to Page]
- 4.11.1 Assessment method
- 4.11.2 Criteria
- 4.12 Sprinkler temperature identification [Go to Page]
- 4.12.1 Assessment method [Go to Page]
- 4.12.1.1 Glass bulb sprinklers
- 4.12.1.2 Fusible link sprinklers
- 4.12.2 Criteria
- Table 6 — Nominal operating temperatures and colour codes [Go to Page]
- 4.13 Water distribution [Go to Page]
- 4.13.1 General
- 4.13.2 Assessment method 1 [Go to Page]
- 4.13.2.1 General
- 4.13.2.2 Assessment method for spray pattern sprinkler with at least K160
- Figure 1 — Arrangement of the K160 / K200 sprinklers at the water distribution (9 m2)
- Table 7 — Assessment parameters for spray pattern sprinkler [Go to Page]
- 4.13.2.3 Assessment method for extended coverage sidewall sprinklers with at least K80
- Table 8 — Water distribution requirements for individual extended coverage sidewall sprinklers
- Figure 2 — Layout of the test room for determining the water distribution of extended coverage sidewall sprinklers (20,25 m2)
- Figure 3 — Layout of the test room for determining the water distribution of extended coverage sidewall sprinklers (19,5 m2) [Go to Page]
- 4.13.2.4 Criteria for test method 1 [Go to Page]
- 4.13.2.4.1 Spray pattern sprinkler with at least K160
- Table 9 — Spray pattern sprinkler with at least K160 test criteria [Go to Page]
- 4.13.2.4.2 Extended coverage sidewall sprinklers with at least K80
- Table 10 — Extended coverage sidewall sprinklers with at least K80 test criteria [Go to Page]
- 4.13.3 Assessment method 2 [Go to Page]
- 4.13.3.1 Spray pattern sprinklers with at least K160
- Figure 4 — Standard coverage sprinkler water distribution test layout of the four-sprinkler test
- Figure 5 — Standard coverage sprinkler water distribution test layout of the six-sprinkler test
- Figure 6 — Typical branch line for piping configuration for upright sprinklers
- Figure 7 — Typical branch line for piping configuration for pendent sprinklers
- Table 11 — Distribution requirements [Go to Page]
- 4.13.3.2 Extended coverage sidewall sprinklers with at least K80
- Table 12 — Distribution test conditions for upright and pendent extended coverage sprinklers
- Table 13 — Distribution test conditions for sidewall extended coverage sprinklers [Go to Page]
- 4.13.3.3 Criteria for test method 2 [Go to Page]
- 4.13.3.3.1 Spray pattern sprinklers with at least K160
- 4.13.3.3.2 Extended coverage sidewall sprinklers with at least K80
- 4.14 Actual Delivered Density
- Table 14 — ADD measurements for K160 EC upright sprinklers
- Table 15 — ADD measurements for K160 EC pendent sprinklers
- Table 16 — ADD measurements for K200 EC upright sprinklers
- Table 17 — ADD measurements for K200 EC pendent sprinklers
- Table 18 — ADD measurements for K280 EC and CMSA pendent sprinklers
- Table 19 — ADD measurements for K360 CMSA upright sprinklers
- Table 20 — ADD measurements for K360 CMSA pendent sprinklers
- Table 21 — ADD measurements for K360 EC upright sprinklers
- Table 22 — ADD measurements for K360 EC pendent sprinklers [Go to Page]
- 4.15 Extinguishing performance [Go to Page]
- 4.15.1 Assessment method
- 4.15.2 Criteria
- 4.16 Discharge coefficient [Go to Page]
- 4.16.1 Assessment method
- Figure 8 — Test apparatus for measuring nominal discharge coefficient [Go to Page]
- 4.16.2 Criteria
- Table 23 — Discharge coefficient ranges [Go to Page]
- 4.17 Sensitivity (Response time index) [Go to Page]
- 4.17.1 Assessment method
- 4.17.2 Criteria
- 4.18 Frame strength [Go to Page]
- 4.18.1 Assessment method
- Figure 9 — Example of a tensile/compression test machine [Go to Page]
- 4.18.2 Criteria
- 4.19 Strength of release element – fusible link type [Go to Page]
- 4.19.1 Assessment method
- 4.19.2 Criteria
- 4.20 Strength of release element – bulb type [Go to Page]
- 4.20.1 Assessment method
- Table 24 — k-factors for normal distributions to determine one sided tolerance limits [Go to Page]
- 4.20.2 Criteria
- Figure 10 — Graph of service load and bulb strength distribution curves [Go to Page]
- 4.21 Water hammer [Go to Page]
- 4.21.1 Assessment method
- 4.21.2 Criteria
- 4.22 Strength of deflector [Go to Page]
- 4.22.1 Assessment method
- 4.22.2 Criteria
- 4.23 Vibration resistance [Go to Page]
- 4.23.1 Assessment method
- Figure 11 — Vibration test curve [Go to Page]
- 4.23.2 Criteria
- 4.24 Impact test [Go to Page]
- 4.24.1 Assessment method
- 4.24.2 Criteria
- 4.25 Freezing [Go to Page]
- 4.25.1 Assessment method
- 4.25.2 Criteria
- 4.26 High ambient temperature exposure (90-day test) [Go to Page]
- 4.26.1 Assessment method
- 4.26.2 Criteria
- 4.27 Thermal shock [Go to Page]
- 4.27.1 Assessment method
- 4.27.2 Criteria
- 4.28 Corrosion [Go to Page]
- 4.28.1 Assessment method
- 4.28.2 Criteria
- 5 Marking
- Table 25 — Marking letters for types of sprinklers and mounting positions
- 6 Manufacturer’s installation instructions
- Annex A (normative) Tolerances
- Annex B (normative) Extinguishing performance
- B.1 General
- B.2 Values for performance under fire
- Table B.1 — K160 upright and pendent sprinkler fire test limits
- Table B.2 — K160 upright and pendent sprinkler test scenarios
- Table B.3 — K200 Upright and pendent sprinkler fire test limits
- Table B.4 — K200 upright and pendent CMDA sprinkler fire test scenarios limits
- Table B.5 — K200 Extended coverage (non-storage) sprinkler fire test limits
- Table B.6 — K200 extended coverage (non-storage) sprinkler fire test scenarios
- Table B.7 — K200 Extended coverage (non-storage) horizontal sidewall sprinkler screening fire test limits
- Table B.8 — K200 extended coverage (non-storage) horizontal sidewall sprinkler obstruction fire test limits
- Table B.9 — K200 extended coverage (non-storage) horizontal sidewall sprinkler application fire test limits
- Table B.10 — K200 extended coverage (non-storage) horizontal sidewall sprinkler test scenarios – screening tests
- Table B.11 — K200 Extended coverage (non-storage) horizontal sidewall sprinkler test scenarios – obstruction tests
- Table B.12 — K200 extended coverage (non-storage) horizontal sidewall sprinkler test scenarios – application tests
- Table B.13 — K240 upright CMDA sprinkler fire test limits
- Table B.14 — K240 upright CMDA sprinkler fire test scenarios
- Table B.15 — K280 pendent CMSA sprinkler fire test limits
- Table B.16 — K280 pendent CMSA sprinkler fire test limits (continued)
- Table B.17 — K280 pendent CMSA sprinkler fire test scenarios
- Table B.18 — K280 pendent CMSA sprinkler fire test scenarios (continued)
- Table B.19 — K360 upright and pendent CMDA sprinkler fire test limits
- Table B.20 — K360 upright and pendent CMDA sprinkler fire test scenarios
- Table B.21 — K360 upright and pendent extended coverage sprinkler fire test limits
- Table B.22 — K360 upright and pendent extended coverage sprinkler fire test scenarios
- Figure B.1 — Full scale fire test array for K160 and K200 upright and pendent CMSA and CMDA sprinklers, Test A
- Figure B.2 — Full scale fire test array for K160 and K200 upright and pendent CMSA and CMDA sprinklers, Test B
- Figure B.3 — Full scale fire test array for K200 upright and pendent storage sprinklers, Test C
- Figure B.4 — Full scale fire test array for K200 extended coverage sprinkler
- Figure B.5 — Sprinkler system layout - K200 extended coverage horizontal sidewall sprinkler
- Figure B.6 — Sprinkler installation position K200 extended coverage horizontal sidewall sprinkler
- Figure B.7 — Full scale fire test array for K200 extended coverage horizontal sidewall sprinkler
- Figure B.8 — Array positions for screening tests for K200 extended coverage horizontal sidewall sprinkler
- Figure B.9 — Obstruction configuration and array position for K200 extended coverage horizontal sidewall sprinkler
- Figure B.10 — Full Scale fire test array K240 upright CMDA sprinkler, Test A
- Figure B.11 — Full scale fire test array for K240 upright CMDA sprinkler, Test B
- Figure B.12 — Full scale fire test array for K280 Pendent CMSA sprinkler, Test A and B
- Figure B.13 — Full scale fire test array for K280 Pendent CMSA sprinkler, Test C
- Figure B.14 — Full Scale fire test array for K280 Pendent CMSA sprinkler, Test D and E
- Figure B.15 — Full scale fire test array for K280 Pendent CMSA sprinkler, Test F
- Figure B.16 — Full scale fire test array for K360 Upright and Pendent CMDA sprinklers, Test A
- Figure B.17 — Full scale fire test array for K360 Upright and Pendent CMDA sprinklers, Test B and C
- Figure B.18 — Full scale fire test array for K360 upright and pendent extended coverage sprinklers, Test A
- Figure B.19 — Full scale fire test array for K360 upright and pendent extended coverage sprinklers, Test B and C
- Figure B.20 — Full scale fire test array for K360 upright and pendent extended coverage sprinklers, Test D
- Annex C (informative) Actual delivered density (ADD)
- Figure C.1 — Actual delivered density (ADD) apparatus, plan view
- Figure C.2 — Actual delivered density (ADD) apparatus, elevation view
- Bibliography [Go to Page]