Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
ISO 6182-2:2025 Fire protection - Automatic sprinkler systems - Part 2: Requirements and test methods for sprinkler system alarm valves, check valves, water motor alarms, retard devices and accelerators, 2025
- Foreword
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Production testing and quality control [Go to Page]
- 4.1 Responsibility
- 4.2 Production body strength test
- 4.3 Production operation test
- 4.4 Production leakage test
- 5 Requirements [Go to Page]
- 5.1 Overview
- 5.2 Nominal size
- 5.3 Connections
- 5.4 Rated working pressure
- 5.5 Body and cover
- 5.6 Strength (see 6.2)
- 5.7 Access for maintenance
- 5.8 Components (see 6.3, 6.4 and 6.12)
- 5.9 Leakage (see 6.5)
- 5.10 Non-metallic components (excluding gaskets, seals and other elastomeric parts) (see 6.5, 6.6, 6.7 and 6.11)
- 5.11 Sealing assembly elements (see 6.8)
- 5.12 Clearances (see 6.9)
- 5.13 Hydraulic friction loss (see 6.10)
- 5.14 Endurance (see 6.11)
- 5.15 Operational performance (see 6.12)
- 5.16 Equilibrium time (see 6.15)
- 5.17 Drains (see 6.4)
- 5.18 Alarms (see 6.11)
- 5.19 Retard devices (6.16) [Go to Page]
- 5.19.1 General
- 5.19.2 Strength
- 5.19.3 Strainer
- 5.19.4 Support
- 5.19.5 Retard chamber drain
- 5.19.6 Components (see 6.6, 6.7, 6.12)
- 5.20 Height limitations for wet pilot lines (see 6.12)
- 5.21 Water motor alarms (see 6.17)
- 5.22 Water motor alarm connections (see 6.17)
- 5.23 Water motor alarm nozzles and strainers
- 5.24 Water motor alarm operation (see 6.17)
- 5.25 Water motor alarm bodies and covers
- 5.26 Water motor alarm audibility (see 6.17)
- 6 Tests [Go to Page]
- 6.1 Samples
- 6.2 Body strength (see 5.6)
- 6.3 Spring and diaphragm test (see 5.8.5)
- 6.4 Anti-reseating test of dry, preaction and deluge valves (see 5.8.6)
- 6.5 Leakage and deformation tests (see 5.9) [Go to Page]
- 6.5.1 Body leakage test
- 6.5.2 Sealing assembly test
- 6.5.3 Wet and check valve leakage
- 6.6 Warm water ageing test for non-metallic components (excluding gaskets and seals and other elastomeric parts) (see 5.10, 5.19 and 5.21)
- 6.7 Air ageing test for non-metallic components (excluding gaskets and seals and other elastomeric parts) (see 5.9, 5.18 and 5.20)
- 6.8 Sealing element tests for valves (see 5.11)
- 6.9 Salt mist corrosion test (see 5.12.2 and 5.12.7) [Go to Page]
- 6.9.1 Reagents
- 6.9.2 Apparatus
- 6.9.3 Procedure
- 6.10 Hydraulic friction loss test for valves (see 5.13)
- 6.11 Endurance test (see 5.14, 5.18)
- 6.12 Operational tests (see 5.15, 5.20) [Go to Page]
- 6.12.1 General
- 6.12.2 Installation
- 6.12.3 Dry and preaction valve differential
- 6.12.4 Preaction valve operation
- 6.12.5 Preaction operational test in the dry mode (sprinkler operation with detection fault)
- 6.13 Wet valve alarm and sensitivity test (see 5.15)
- 6.14 Wet and check valve ratio test (see 5.15.5)
- 6.15 Equilibrium time test (see 5.16)
- 6.16 Retard chamber (see 5.19) [Go to Page]
- 6.16.1 Strength
- 6.16.2 Drainage
- 6.17 Water motor alarm tests (see 5.21) [Go to Page]
- 6.17.1 Durability
- 6.17.2 Audibility
- 6.17.3 Strength of inlet connection
- 6.17.4 Water resistance
- 7 Marking [Go to Page]
- 7.1 Body
- 7.2 Cast markings
- 7.3 Information to be marked
- 8 Manufacturer’s installation instructions [Go to Page]
- 8.1 Instructions
- 8.2 Care and maintenance [Go to Page]